Over the weekend I accomplished:
1. Corrected seeping fluid leak from rear axle.
2. Completed installation and wiring of tail lights.
3. Completed initial greasing of all chassis grease points.
4. Installed outside mirrors.
5. Finalized A/C wiring under hood (bundled, clamped in place).
6. Adjusted rear brakes and parking brake.
7. Installed exhaust system.
8. Installed exhaust heat shield under bed wood.
9. Adjusted front wheel bearings.
10. Tightened/adjusted all steering linkage joints.
11. Added engine oil, primed pump, final installation and initial timing of distributor. Installed plug wires.

I have 11 items on the list before the restoration is 100% complete. Easy items such as add fuel, add coolant, set toe-in, install new wheels and tires, bleed brakes, ....

Last edited by DavidF; 06/16/2014 3:46 PM.