Another nice day so I spent some time working on the truck.
Replaced the header collector gaskets Reconnected the exhaust Tightened the trans pan bolts and the drain plug bolt Put roughly 7.5l of trans fluid in Main floor is back in Shifter’s mounted Redid the throttle cable Checked the fuel line connections for tightness Connected the dist to the negative side of the coil Fought with the cross member to get it into place… missing a bolt and it looks like the front of the new trans pan might interfere with it Had the tire mounted on the 15x7 rim the other day. Now both rears are sporting 255/70r15 Got the truck off the stands and back on solid ground Made a list of things still to do.