Started with some 180 grit and a long block. That black primer IS epoxy but it has been in the sun way too long. Spent about 10 minutes on it as I wanted to see if I could get away with ladders, or if it would be good to set up the scaffolding now. I’ll stick with the ladders a little longer. You can already see a lot of the high and low points revealing themselves.