Ok. Had to put the wife's car in to the dealership for the 10 year, 120,000 mile warranty on the timing chains. She's on her 10th year, 115,000 and some change. Good timing. Lemony car. Second timing set!! But that's not why we're here! She get's the crew cab for a daily driver, I get the Burb!
So, the corners are welded in, but that's about it. I gave it a quick coat of rattle can so it wouldn't rust since it is rainy around here. So I figured, good time to smooth out the rear gravel pan. Pretty flimsy. So I made a plywood buck to hold it and that seems to help. Currently spending some time on that.
Today, I had the chance to run the rear seat frames down to the powder coater. They should be ready in two weeks. Maybe. He always says two weeks but it ends up being more like three. $120.00 Usually a decent deal out of him. That's blasted and coated. While I'm waiting, I'll smooth out my clamp brackets since they are currently rough cut.
Tomorrow morning, I get up, head an hour South to find me a new rear bumper and a pair of running boards. I figure it's about time. I was going to have the chrome shop do the rear bumper but it's not original to the vehicle so I have no attachment to it. I'll stick it somewhere out in the yard in case I change my mind.
Once I throw some paint on the gravel pan, I'll roll the Burb back in to the shop and smooth out the rear corners. Also, finish the passenger outer to inner wheel well. And, I have a few holes to patch between the drivers door and rear fender. That should be it for rust until I do the engine swap. That's when I'll address any firewall/floor issues.
I have a punch list on my dry erase and that list is getting smaller. Soon, it will be time to paint. Maybe even this summer!! I do have a few shows to attend. We'll see. It wouldn't bother me to roam around with partial paint!