I decided that I should finish the wood (pine) for my bed even though it will be a while before I am ready to assemble the bed. I am using an original treatment of penetrating epoxy from Smith & Company followed by a spar varnish. It is taking a while as there are a number of coats to be applied ot both sides of the wood.

Took advantage of the recent warm weather (it is suppose to snow tomorrow) to make a junk yard run. Picked up a gas pedal and cable, a fuel filler, a horn, and shifter boot all of which will require some adaptation but at least give me something to start with. Still a little hard to visualize how I will fashion the fuel filler into the rear fender but hopefully it will become clearer when I can mount the bed side and fender to get a better idea of the spacial relationship between the fender and the filler hose pathway.
Attachments
20230415_131151.jpg (223.85 KB, 243 downloads)

Last edited by WICruiser; 04/16/2023 12:59 PM.

1949/50 3600 Project
Follow in Project Journals