It does sound pretty good and looks great too. I've had my sending unit out 3 times and I'm still trying to get it to read accurate, a little bend on the float arm each time to make sure the float is free and reads more than 1/4 tank. I ran separate ground wire from the sending unit to the frame and also from the gauge to the frame. I'll know this weekend when I go to fill it up YIKES I'm not looking forward to that at 1.50 a litre for V power oh well we could be on the west coast LOL. The sediment bowl is a pain to seal I made a gasket using double thickness with Gasgacinch sealer between and seemed to work for me no leak. All that little stuff takes time and perseverance but it'll get done. You still have over 6 weeks before Reynolds! I think your helper was impressed too, I meant the young one by the way! Great job