As I said, the brake project was put on hold by the Scripps engine. The plan was to strip and evaluate the engine and then go back to the 2 ton while I located and ordered parts. That schedule was interrupted by a medical procedure. Had to have an artery in my lower leg cleared out with a lazer. Procedure was simple but was restricted to not lifting, carrying, dragging etc more than 10 lbs for a while. That includes getting up and down on a creeper and crawling under the dash. Did some painting of misc. parts and bench work and it was time to go back on the engine. Will get back to the brakes soon.