Well after a week the pieces I sprayed with the liner are still tacky, so I moved back to the cab this weekend.

Welded the bottom of all my patches and started fitting the 5 speed now that my lift is operational again.
Attachments
20221217_142308.jpg (85.47 KB, 194 downloads)
20221217_142300.jpg (82.28 KB, 194 downloads)


1966 C-10 Step Side
"Augustus"
Engage in the DITY
or follow along in his
Project Journal