Finally made some real progress with the rockers. Have the front cab support, A and B pillar in measured place. Inner rocker and floor section then fell into place. Kick panel is cut in and ready to find its home, but I need to do something with the lower section of the firewall before I weld it home.

My cab support did end up being too long. I needed to cut the ears off that touch the inner floor support and re-drill the mounting hole. I will reattach the ears once the cab is off and I can tip it up on one side or the other.

With only a few tacks the pass side, it is far more rugged vs the rusty drivers side.

Measurements are spot on except for the door opening. Pass side has ended up being a strong 1/16 larger than the drivers side. I haven't hung the door to check gaps yet, but I think I can live with splitting a 1/16 front to back.

Now onto the cab corner and rear cab mount.
Attachments
20220612_075349.jpg (183.76 KB, 257 downloads)
20220612_075329.jpg (120.95 KB, 257 downloads)
20220612_075337.jpg (123.23 KB, 257 downloads)
20220612_075418.jpg (165.31 KB, 255 downloads)


1966 C-10 Step Side
"Augustus"
Engage in the DITY
or follow along in his
Project Journal