Since your waiting on sheathing, there will be nothing preventing the walls from racking. Level your studs than nail a couple diagonals at a 45° angle to your studs. Make sure you start at a side and finish on the top or bottom plate to create a triangle. Apply them to the inside so you can sheath without removing them. Once sheathed, they can be removed

Last edited by Phak1; 05/15/2022 12:50 PM.

Phil
Moderator, The Engine Shop, Interiors and Project Journals

1952 Chevrolet 3100, Three on the Tree, 4:11 torque tube
Updated to: ‘59 235 w/hydraulic lifters, 12v w/alternator, HEI, PCV and Power front Disc Brakes
Project Journals
Stovebolt Gallery Forum