John, I had already thought about that. We may not have frozen ground but we have Hurricanes, I want to have a solid base.
I was just laying out where to place the rebar. I plan to set the rebar 4 inches and epoxy them in. I will have 12 inches in the lock to fill with concrete. I discussed the layout with Alvin and the was one of his suggestions.
I have a few questions, should I set the blocks back from the edge or flush with it. I shouldn't need to run rebar horizontal with the course should I?


~ Craig
1958 Viking 4400
"The Book of Thor"
Read the story in the DITY
1960 Chevrolet C10
"A Family Heirloom"
Follow the story in the DITY Gallery
'59 Apache 31, 327 V8 (0.030 over), Muncie M20 4 Speed, GM 10 Bolt Rear... long term project (30 years and counting)

If you don't like driving yourTruck, you won't drive yourTruck..| Living life in the SLOW lane