This is the cost associated with this project so far: $5797.06
I originally poured the slab, 28' x 40', in 2012: $4200.00
Concrete blocks: $277.00 (200)
Concrete Mix 80 Lbs. bags : $198.69 (22)
Hardware (rebar, J-bolts, deck screws): $83.17
Lumber ( 60-2"x4"x12'
8-2"x4"x16'
4-2"x6"x16'
8-2"x8"x16') : $1038.20
I had 10 80 Lbs. bags of Type "S" mortar donated to me by a friend