I clearly remeber your advice Tony. Don't blow it up! I have kept that in mind the whole time.
This is a true shade tree restoration. Weather, daylight and time permitting.
Stage 1 complete
Bed off and in storage.
Bodywork on bed pieces pending.
All brakes/lines are new and completely redone.
All frame behind the cab is cleaned and restored.
Front and rear suspension is newly restored including new shocks.
Rear diff cleaned, new bearings and seals.
Stage 2 complete
Engine runs and factory tranny shifts in all gears/reverse.
factory gauge cluster is restored
Steering wheel restored and ready for paint
body panels in front of cab removed and stored.
protective cover for the engine constructed and in place.
Stage 3 (to begin ASAP)
remove cab glass and doors
remove cab and place on cradle
restore remainder of frame
lift engine and freshen it up
beg, borrow or buy 5 speed MT (T5 or Tremec) research ongoing
install tranny crossmember
modify driveshaft
Stage 4
Restore cab then epoxy primer
restore doors
more bodywork and epoxy primer
etc. (does it ever end?)
