once I get these measurements it will take me maybe 15-25 minutes to draw up both brackets on AutoCAD and then another 20 minutes to put them into 3d to make sure they will work. Then maybe two days to get a quote to have them laser cut out of 1/4 mild steel. I love having autocad, 100 times better than manually drawing, if a measurement is off, I usually will see in the process of drawing it.
Another question. Do you think 1/4" is more than needed, would 3/16" be sufficient enough?
Im going to be going to the local yard this coming weekend and comparing GM and dodge pumps. From what I can see they are exactly the same aside from a few things. I just want to make sure the width of the pump where it mounts is the same.
Last edited by drummin52; 01/21/2009 5:04 AM.