Finally getting back into my project. After getting a garage delivered, wiring up the garage, insulating the walls and putting the truck, converting an air compressor from gas to electric, moved my sandblaster inside (most larger things were at work). Still have more to do in the garage and said the heck with it, started on the truck till I run into a stop and I'll get back working on the garage. At least it'll give me more time to thing where I want things placed to work, benches, shelves, TV, fridge, etc.
So far removed the entire wiring harness and looking for a non insulated flag crimper and terminals. removing stiff wire was a chore especially when I was diagnosed with Carpal Tunnel Syndrome. Worked thru the pain as I wanted to get this start to finish. Yes, I marked almost everything and will be making a harness. Looking around for the gauge parts, found the labels, looking for the glass and instructions somewhere on how to tear it down to rebuild (54 gauges are hard to get parts for). Will be pulling the heater and wiper motor to go thru, figure why not. I really need to remove the seat frame as it's very awkward to work in there as I am no longer as limber as I used to be, good thing I have an auto mechanic son to help when needed, LOL. I'll need to pull the gas tank as I have noticed a lot of dust, weeds and crap under it. At least I am getting there and hopefully stick with it thru the summer and maybe winter if the ceiling gets insulated. Wife wanted recliner out of house so I found a new space for it, Cooper and Thor approves.
Now a work in progress even if I work on it a hour here and there. Just keeping in touch...