Well Northwest Drivelines still has my driveline said it should be done by the end of the week. That’s five days now :mad: .
Today I put new 1X3 oak cushion strips on the frame for the box to rest on. That took some time, had to counter sink the carriage bolts and drill holes about halfway though with a ¾ forcener bit for all the rivets in the frame.
Also got a new short speedometer cable the one from the two speed shift too the speedo. And put the PTO back on.
On another note I stopped to see the progress on the big block for the fifty six should be bringing it home next week

.
Well by for now I am going to go surf the site a bit and go to bed :p .