| |
Click on image for the lowdown. 
====
| | | Forums66 Topics128,051 Posts1,055,764 Members48,426 | | Most Online14,466 Apr 26th, 2026 | | AD Chevy Trucks Over 6,000 pictures Brad Allen has an awesome collection of Chevrolet factory pictures that he has set up from film strips. Check them out!
Lots of work on Brad's part ... pure enjoyment (and references) for you!
| | THANKS!
For helping keep this great
old truck web site
on the Internet for over 30 years! and not clogged down with Ads! Again, thanks! | | | | Joined: Sep 2011 Posts: 2,951 'Bolter | | 'Bolter Joined: Sep 2011 Posts: 2,951 | I had more concrete poured today. Might add a lean-to. It's 9 feet wide for additional parking. Phase 2 - Concrete Pour Go to the bottom for the 8/18/17 update. | | | | | Joined: Apr 2006 Posts: 273 Shop Shark | | Shop Shark Joined: Apr 2006 Posts: 273 | Looks great!  I'll probably faint if you tell me what it all costs. BTW, I like the 65s (both...? Not sure) just before the update. | | | | | Joined: Sep 2011 Posts: 2,951 'Bolter | | 'Bolter Joined: Sep 2011 Posts: 2,951 | Looks great!  I'll probably faint if you tell me what it all costs. BTW, I like the 65s (both...? Not sure) just before the update. I usually don't publish how I spend my money, but I'd be happy to share the info with you by PM. The building was very affordable. Concrete was more than I initially expected, but I could have never done that work. I chose the right concrete guy too, which made all the difference in the world. When we measured the final slab in phase 1, it was dead on 24' X 25'. I'm very happy with this shop. It was a good value and a good investment. | | | | | Joined: Apr 2006 Posts: 273 Shop Shark | | Shop Shark Joined: Apr 2006 Posts: 273 | I was just kidding about the cost.  No need to tell me. I spent a lotta money on my property too (and I didn't even faint)  and I think its great that people make all kinds of improvements to get everything just the way they want them. Cheers.
Last edited by Old 'Burb Lover; 08/20/2017 5:45 PM. Reason: badd spelinn
| | | | | Joined: Nov 2008 Posts: 544 Shop Shark | | Shop Shark Joined: Nov 2008 Posts: 544 | Around here concrete is running $6/sq ft for flatwork. Goes up if it has beams/piers or is more than 4" thick. $100/yd for material before padwork and labor. Doesn't take much to drop some serious cash. Plus, its not like you can "fix" a bad pour, so you need someone who can form and finish it right. Which costs more. For me, I'll pay extra for someone that I can trust to do it right. I had a discount guy pour one for me. Never never never again. Rushed the finish, broke forms too early, didn't turn out how I had hoped.
I need a 6" slab poured with beams in an area about 40'x60'. For that job, I'm going to rent a machine, bring in the fill and prepare the pad myself, form and lay steel in it and just hire someone to pour and finish. | | | | | Joined: Dec 2001 Posts: 14,522 Moderator: Welcome Centre, Southern Bolters, Legion Hall | | Moderator: Welcome Centre, Southern Bolters, Legion Hall Joined: Dec 2001 Posts: 14,522 | ....poured quite a few yards of concrete mid summer. $115 a yard and the guy charged me 40 per yard to form and pour it. Did a great job. This day and time I hear some folks say "aw, anybody can pour concrete". Yeah right! | | | | | Joined: Jan 2012 Posts: 843 'Bolter | | 'Bolter Joined: Jan 2012 Posts: 843 | 220 a cube downunder for the concrete even more for the rebar
57 3200 pickup 265 V8 with service tray
| | |
| |
| |