The shoe with the biggest lining goes to the rear, adjuster goes on that shoe, linkage from adjuster goes onto the top post, then the rear spring goes from the shoe to the linkage. Put the lower spring on and install adjuster wheel so the wheel is under the adjuster arm. Install front shoe then the spring goes to the upper post,
some years and models may vary some but it should get the job done,
Scott


Scott Ward

2 1948 1.5-ton Loadmasters
The red one and The snow pusher
1 1950 3100
1 1955.1 Chevy 6500
1 1954 Chevy 6500 2-Ton
1 1955 1st Series COE 5700
1 1963 K20 (454)
1 1964 C10 (350)
1 1951 1.5-ton Dump Truck
1953 and a 1956 Ford F800

Raising a teenager is like trying to nail Jello to a tree!