Some Progress - Jig being made today (my fabricator has been backed up with work). The first unit will be cut the end of this week. Formed the next. Here is a link to a power point presentation that I put together. Units can be shipped via UPS in two boxes. The upper spring perches will be shipped in a separate box than the main cross member and boxing plates. The total metal mass is currently just under 75#, breaking this up allows easy shipping, as well as it allows me to create custom spring perches for coil over's or Shockwave's in the future.
I plan on having the prototype welded up by the first week in July for pictures and then to have the truck rolling a few days later, and the engine placed soon after that. The first proto will not be getting the steering rack tabs as I need to make sure everything works properly prior to welding. I might leave steering up the the purchaser (GM rack, Mustang 2, Appleton, Sweet, etc) Currently the attempts at fitting the S-10 steering box have been put on the back burner.
I will be writing a step by step procedure for locating and welding the cross member during my first installation.
I should have an updated price by end of week.
Scott
The problems we face today can not be addressed at the same level of intelligence we were at when we created them - Albert Einstein Or with the same level of $ - Me