Next up for the day is breaking down some parts. The impact made short work of the 9/16 head bolts holding the ring on the carrier. I also ground down the peened dowel and drove it out to save this pinion from one of the parts trucks. (I removed this months ago so I don't remember offhand which one it came out of. Ring and Pinion will get in line for their evaporust baths. Currently I have a good hub soaking.
Attachments
1.jpg (267.89 KB, 308 downloads)
2.jpg (304.38 KB, 309 downloads)
3.jpg (186.2 KB, 309 downloads)
4.jpg (187.08 KB, 313 downloads)
5.jpg (169.92 KB, 307 downloads)
6.jpg (166.95 KB, 312 downloads)
7.jpg (157.93 KB, 305 downloads)
8.jpg (254.17 KB, 309 downloads)


~ Daniel Davidson
1939/1940 Chevrolet/GMC
Follow his Project Journal