Well, not allot of stuff accomplished over winter like I hoped. Putting together a new 235 thats still at the machine shop. Lucked out on going .040 over. Fully rebuilt head, Schneider reground cam waiting to show up. In the mean time, I do have all new glass/seals installed and some welting installed. Most of the wiring laid out. Waiting on a back ordered clip thats riveted to the headlight canister, as one is broken.
Attachments
image0-32.jpeg (52.27 KB, 122 downloads)
image2-21.jpeg (27.12 KB, 126 downloads)
image1-26.jpeg (45.75 KB, 124 downloads)
image3-21.jpeg (52.29 KB, 117 downloads)