I recently got the bottom end of my 235 engine buttoned up so it was ready to get off the engine stand and set it into the frame. Before I could do that, I needed to get the new brake lines installed. Instead of buying a 25' roll of tubing (I would never need that much), I chose to go with pre-made sections (with fittings) from my local NAPA. I planned out the runs so that I'd have a minimum of cutting/flaring to do, and a minimum of fittings. I used 1/4" nickel coated copper tubing which was very easy to shape by hand (although I used a tubing bender for the tight turns). Both the front and rear circuits have 10 lb. residual valves installed right at the master cylinder. While I was able to complete the circuit to the front brakes, I did not finish the run to the rears. I still need to purchase an adjustable proportioning valve which will go in the line near the rear axle.
Once the brake lines were in place, and I had put my clutch and brake pedals back on, I was finally able to set the engine into the frame. This was a big milestone and I celebrated with a couple pints of Guiness afterwards.
Turning away from the engine project for a little bit, I decided to work on my front brake situation. To recap, I am converting my 3/4 ton truck from Huck to Bendix brakes on the front. I was able to acquire a pair of backing plates from another Stovebolter not too long ago, which got the project moving in the right direction. What I didn't know at the time, though, was that the '53-'59 3/4-ton brakes also have a separate sheet metal piece that slips over the spindles to close off the openings in the backing plates (spaces needed to allow the backing plates to clear the turn stops). Instead of searching for a pair of these covers, I decided to make them myself. They are made of 18 ga. sheet metal and 1/4 sections of EMT conduit. I used a plasma cutter to cut out the sheet metal bits, and then put it all together with my mig welder. When the cover was all welded together and dressed out, I temporarily bolted it to the backing plate, chucked it up in the lathe and bored the spindle hole. A little tweaking of the bolt holes later and the first one is ready to be painted.
Brian
'51 Chevy 3604 Project '28 Chevy LO basket case '83 GMC Sierra 4x4