the latest progress

All the misc. riveted bits go into the chassis at this stage, I don't want to be driving rivets home when there are electrical parts or transformers installed later on.

Cleaned up the excess zinc plating on the holes and edges of the chassis.
The vibrator clamp will be replaced as it has broken tabs. The new one will be riveted with tiny steel rivets in place of the spot welds in addition to the socket rivets which go through the clamp, chassis and socket.
I would not recommend dip galvanizing, it's a pain and not original.
It would be better to spend more time getting the electroplating to work out as it was originally done, but getting the inside corners to plate is difficult. I will live with this learning experience for now on this radio.

I riveted the tube sockets back in using my handy small engine valve clamped into my table top vise.
Some insulating papers were not the best shape, i found a very similar cardboard at my local junk store in San Jose Cali. If anyone is near the bay area, check out Excess Solutions, you will spend a whole day rummaging around smile
Attachments
chassis.jpg (117.21 KB, 161 downloads)
rivet.jpg (99.55 KB, 162 downloads)
bits.jpg (201.39 KB, 159 downloads)
paper.jpg (140.19 KB, 161 downloads)
sockets.jpg (131.65 KB, 160 downloads)