Put Summits 16 gal. racing fuel tank back of the frame between the last 2 rails. Had to cut 1 1/2" off the very back lower part of the cross member. 1/2" off the 2nd to last rail lower part.

Welded in a piece of 1/2 bar stock to the inside of the back cross member. Drilled and taped (I drill bit) 5/16th tap and bolted my SS Mirror (1" wide)finish straps with that. Had to cut a 1/2" 1/2 moon in back top rail to give brathing tube room. Very easy install 1 days work. Ben

popcorn The Truth is Out There (E-mail me if you need more help)