Yup, Rugo is going to show up Sunday am and we are going to fire off the diesel burner hooked to a pressure washer and see if we can clean it up without scalding each other

Then POR15 it and start on the springs. . . at some point we run out of things to take apart and it will start to go back together.
Air plumbing should be done on Sunday too - get to see where all the leaks are :o Bought the MDF today and ripped it in half for the benches. Also picked up a 6in Wilton vise - $69.00 at Lowes. The 5 inch vise I have mounted in the garage was like $179.00 (Made in USA) . . . the $69.00 vise said Made in China to Wilton specifications. I compared the two and only noted that the US made vise had carburized crank handle and swivel clamps while the asian one had chromed mild steel handles. Castings look the same weight - time will tell.
I will start hanging ceiling joists next and hanging sheetrock - that will brighten it up. Soon the split in labor between the shop and the trucks will swing more toward the trucks!
