I have the parts to start assembling the bed on my 49 3/4 ton. I know the metal clamps go on the cross sills. What is next in the stack, the rubber pad or the wooden block? Also, the rear shock links were rusted off. What is the proper length of these links? I have the upper parts that pin to the shocks so I am going to fabricate the lower part and weld them together
Thanks