| |
Click on image for the lowdown. 
====
| | | Forums66 Topics128,021 Posts1,055,357 Members48,420 | | Most Online14,466 Apr 26th, 2026 | | AD Chevy Trucks Over 6,000 pictures Brad Allen has an awesome collection of Chevrolet factory pictures that he has set up from film strips. Check them out!
Lots of work on Brad's part ... pure enjoyment (and references) for you!
| | THANKS!
For helping keep this great
old truck web site
on the Internet for over 30 years! and not clogged down with Ads! Again, thanks! | |
#92776 08/28/2005 11:40 PM | Joined: Oct 2003 Posts: 5,152 Cruising in the Passing Lane | | Cruising in the Passing Lane Joined: Oct 2003 Posts: 5,152 | Its possible, but I'd go for the maxi fuse instead if it were me.
A fusable link protects the wiring but needs to be big enough to carry the normal load. If the circuit needs 12 guage wire 18 guage isn't going to be big enough. You'll be replacing that link all the time if it really requires 12 guage normally.
Fuses are a lot easier to get right.
1955 1st GMC Suburban | 1954 GMC 250 trailer puller project | 1954 GMC 250 Hydra-Matic | 1954 Chevy 3100 . 1947 Chevy COE | and more... It's true. I really don't do anything but browse the Internet looking for trouble... | | |
| |
| |