Originally Posted by OldSub
Originally Posted by Scott Danforth
That is getting into the lots-o-wwork category.
All these projects take longer, cost more and are more work than originally expected.

Correct, take your estimate of money and time, then multiply by 3 or 4 and your close.


The problems we face today can not be addressed at the same level of intelligence we were at when we created them - Albert Einstein Or with the same level of $ - Me