If the hubs breaking are the danger I'd check into a couple of things.
First talk to a mechanical engineer about strengthening the hub. Perhaps an engineer can suggest a way to increase the strength enough to make the machine shop happy.
Second have the hubs magnifluxed to make sure they are not cracked.
What was the GVRW of that 90's 2-ton. Was it 16,000 or more?