A very productive weekend! A new pilot bushing, clutch, pressure plate and transmission are officially mated to the 235. I also re-installed brake/clutch pedal bracket. I am waiting on my front disc brake conversion kit from Rustic Brakes to arrive and a phone call from the machine shop saying my exhaust manifold is ready to be picked up. I also started in on the cleaning/de-greasing of the torque tube, radiator support and radiator.
Attachments
IMG_8449 3.jpeg (303.16 KB, 148 downloads)
IMG_8451 4.jpeg (292.46 KB, 148 downloads)


1953 GMC 3/4-ton, deluxe cab, long bed
"My biggest project"
Follow the story in the DITY