| Crusing in the Passing Lane Joined: Jun 2011 Posts: 5,096 | Part of my drive is concrete, however the problem is is is not properly drained, all downhill from large yard, so whenever it rains(rare this year) or snow melts, it collects under my project, so working in 4” of water has been helped by putting down gravel so one is not laying in water.
Ed
'37 GMC T-18 w/ DD 4-53T, RTO-610, 6231 aux., '95 GMC running gear, full disc brakes, power steering, 22.5 wheels and tires. '47 GMC 1 ton w/ 302, NP-540, 4wd, full width Blazer front axle. '54 GMC 630 w/ 503 gasser, 5 speed, ex fire truck, shortened WB 4', install 8' bed. '55 GMC 370 w/270, 420 4 speed, grain, dump bed truck from ND. Works OK.
|