Check the lift manufacturer's requirements. When I got my BendPak 10K 2 post they only required a 4" slab though it needed to be 12'x15'. My floor was bad but not bad enough to replace. They suggested 3'x3' piers 10" thick tied into existing slab. I think the 2 post gives better accessibility over the four post.
Chuck