Already made a drawing up Alvin, if I can't find one, I'll drag
the planishing hammer out and make me a bubble. The flange is
what will take the time.
The labor is always cheaper if you can find one already made.
Doesn't cost anything to ask.
Finding the parts for the Bijur lubrication system is gonna
take me some time, so I thought if I got lucky with the
cover it would buy me some time.
dg
Last edited by Denny Graham; 12/23/2015 1:10 AM.