Thanks Jock , Thats what I was thinking about. Your right a little costly. Talk about slowing down a project. Caus you know ya got ta mock up some some OEM and play(or waste time) with what you got laying around the shop b4 throwing out the$$$ But if they are a good smooth working unit, what the heck. Besides someone else needs a job so he can keep his project going.
Less than 24 hours and all ready can "FEEL THE LOVE" Thanks again Gary