Thanks Jock , Thats what I was thinking about. Your right a little costly. Talk about slowing down a project. Caus you know ya got ta mock up some some OEM and play(or waste time) with what you got laying around the shop b4 throwing out the$$$ But if they are a good smooth working unit, what the heck. Besides someone else needs a job so he can keep his project going.

Less than 24 hours and all ready can "FEEL THE LOVE" Thanks again Gary


"Then again the WIFE could be RIGHT
Just Cause I drink alot of BUD that don't make me WISER"