One sneaky trick we used to do when changing frame length was to make the frame rail cut at a 45 degree angle. It makes for a longer weld, and more load-bearing area where the splice is made. A double fish plate job, also at an angle, strengthens the splice to the point it becomes the strongest part of the frame. Haven't had one break yet, even with some horrendous overloads!
Jerry


"It is better to be silent and be thought a fool than to speak and eliminate all doubt!" - Abraham Lincoln
Cringe and wail in fear, Eloi- - - - -we Morlocks are on the hunt!
There is nothing noble in being superior to your fellow man; true nobility is being superior to your former self. - Ernest Hemingway
Love your enemies and drive 'em nuts!