I don't plan on carrying really heavy loads.
Currently is has 2 closed drive shafts. One that goes from the transmission to a split and then another that angels down to the rear.
The first section is 4-5 long and runs parallel to the transmission. I was thinking that I could have a drive shaft made that would run from the T5 to the split. That way I could just leave the rest alone.
My question is about that split point. I was hoping that I could change the transmission side to accept an open drive line.