I'm thinking about using a late model 3/4 ton frame under a 48-53 bolt. Is it as simple as stripping the frame, cutting a section out of the center of the cross members and carefully welding them back together while keeping the frame straight? OR.. would that cause a risk of breaking the welds and causing a failure of the frame?