That load was about 1.5 tons. The next load was bigger, the guy dumped until it ran over the sides and ends, was about the height of the rear window. I would guess about 2 tons of topsoil. Didn't have time for a picture, it was warming up and the kid was getting tired.

Not bad for $25 a load, shredded and stored under a roof. It takes just over a 1.5 ton load to engage the overloads on the old gal.


Fred
52 3600
69 C-10