SUPER 55
I put up a 26X40 coverall building early last summer! After I leveled off a nice gravel pad with the bobcat, It took about 2 - 3 hours a night during the week to measure evrything up drive the pegs and assemble the frame, 6 hours on saturday to cover the frame and lace the ends hang the door 16 X 10 and it was done and ready for big bolt and what ever. Last winter we had lots of snow and no problem last summer and this summer we had winds up past 80 MPH and even had the odd tree break off and land on it but they just bounced off with out a mark I am extremely happy with it and because it is not a permanent structure the gov't can tax me on it.
DS