Well she's done - took about 12 hours over 3 days but the new 700R is on and bolted up. We still have to set in the 2" x 2" cross brace and do some house keeping, but shes ready for the Trans shop to do the final shift adjustment.... I'll bolt on the dust cover, paint the pan bottom and dry fit the propeller shaft (BTW it looks like I may not have to adjust the length as there is only 1/2-3/4' differance in trans length.