First insert the diaphragm assembly into the collar with 4 screws. On top of that slide the larger spring and fasten it with the C clip. Then slide the accelerator actuator over that. It should have the metering rod with spring attached. Then slide two springs over the top, push down and fasten with the smaller C clip. When you install this, be careful to guide the metering rod into the jet. Attached are some images for you. Hope they're helpful. Please send a PM or ask if you have other questions.
Attachments
yf metering rod.jpeg (61.26 KB, 210 downloads)
965s another view of springs.JPG (32.99 KB, 210 downloads)
965s new springs of proper color.JPG (32.98 KB, 203 downloads)
MVC-598F.JPG (29.98 KB, 201 downloads)
MVC-583F.JPG (32.11 KB, 198 downloads)


~ Jon
1952 1/2 ton with 1959 235 | T5 with 3.07 rear end