Originally Posted by Lugnutz
Great tips. I think 10 foot walls are doable. That is if it will allow a lift. Yes, I'd prefer a 2 post lift. In floor heating sounds good but here in SC I doubt I'd spend the money for it. I will need good lighting and electrical. Can I get the lighting and electrical installed after the building is up?
In floor heat isn't that expensive. The tubing isn't all that expensive, and your heat source can be a water heater (preferably gas). One of my buddies has that setup and a lot of the time his shop building is too hot, even when it's way below freezing. You don't need an expensive boiler to run it. I'd get it priced out for comparison. But down there you can probably heat it with a camp stove in the middle of the floor. grin
You probably don't care about finishes, so the electrical and lighting can be surface mounted and done after the building shell is completed (as long as you have the stub-ins for the service - and that can even be overhead or outside the building if underground).


Kevin
1951 Chevy 3100 work truck
Follow this saga in Project Journal
Photos
1929 Ford pickup restored from the ground up. | 1929 Ford Special Coupe (First car)
Busting rust since the mid-60's
If you're smart enough to take it apart, you darn well better be smart enough to put it back together.