On the front pillar base there are 6 holes that align with the holes that go through the floor panel. My replacement pillar extension has the holes pre-drilled, but no nuts welded on. Should all six of these holes have nuts welded to them, or should just the 3 that will be covered by the rocker panel, or all six? Thanks! Janine