Yes Paul, that's the same mount and same problem i have. The replacement rubbers Chevy Duty sold you are just pieces of conveyor belt cut & punched. Your pic shows a 3 ply carcass with a bottom cover and a thicker top cover. This belt comes in all thicknesses, & I've got access to all kinds of it. If you need another thinner piece, let me know & I'll send you a piece (just about any thickness you want) you can cut with a utility knife & drill holes in. I didn't realize that was the material to use for this. I figure you can use bolts ok if they don't interfere with anything. I was thinking of grinding the rivets out & then welding them back up if i can keep from melting the rubber during welding. Maybe some other bolter out there has done this?