ask the place what the after-spray is, if it's phosphoric acid [should be], ask them to be liberal with it, including spraying inside the rear body cavity thru the little covers in the sidewalls - be a good idea to drill some holes in those panels on the inside below the floor level so the cavities there drain well, they can be plugged later - phosphoric acid treatment will last a long time if kept totally dry, Florida humidity may defeat it

if the whole thing is well treated with phosphoric acid [Ospho as CASO says], epoxy will work, the trick is to make sure all the pinch welds are flushed out well so no stripper chem bleeds out under the primer - but you shouldn't count on doing your welding after epoxy unless you're also prepared to strip the epoxy off the area to be worked

Bill


Moved over to the Passing Lane

"When we tug a single thing in nature, we find it attached to the rest of the world" ~ John Muir
"When we tug a single thing on an old truck, we find it falls off" ~ me
Some TF series details & TF heater pics