$15 a foot is for #4, but I would bet that #8 would still cost close to what he paid for the welder for 50 ft stranded. I agree that he should through away the cheap HF power cord, and he should think of possibly stringing 8/3 or 6/3 Romex to near where he is working if his codes will let him do that.