Tony, I am still at work. I work 12 hr shifts and being a shade tree guy, I'll do it this weekend. I'm also replacing the heater control levers at the same time. I referred to a post about accessing the levers through the glove box area so I'm going to follow that procedure. When I finish, I'll post the results. Thanks.
Last edited by Miner54; 06/01/2010 1:56 AM.