The part that gets me is I was quoted 2-3 hours, 3 if they were really rusted in place. The axle was bare, no brakes, backing plates, nothing. Just an axle with two spindles.

The dust caps were out, as were both lock pins. I'm having a hard time seeing how pressing out and installing / reaming new bushings take 5 hours. And that cost doesn't include the parts, I supplied those.