I asked him about it, but he's so busy he wouldn't be able to build it until late fall. Think I should wait that long? Im thinking working in the cold sucks.
Preaching the Hot Rod Gospel according to the 4-stroke apostles:
Suck, Squish, Fire and Fumes
|